HOSTING
ASICs, GPU Farms and Containers

Site location - 200 km from Moscow. Cheep electricity, white socket, contract, technical support 24/7, service, security
  • GPU hosting from 0.04 USD/kWh
  • ASIC hosting from 0.036 USD/kWh
  • Сontainers hosting from 0.029 USD/kWh
Close
Свяжитесь с нами
Telegram
WhatsApp
Phone
CEO interviev
GPU hosting
How is the cost of hosting calculated?

The prices is determined based on the total electricity capacity of the placed equipment.
Our prices for hosting are "all inclusive". This means no extra fees for maintenance, setup and repairs. You only pay for the electricity you use.
The actual cost of services is calculated based on the tariff agreed by the parties, the actual volume of services provided and the actual volume of consumed electricity.


PRICES OF ASIC HOSTING

UP Time 95%
from 0.036 USD/kWh
individuals - 0.036 USD/kWh
organisations - 0.04 USD/kWh
PRICES OF GPU HOSTING
UP Time 95%
from 0.036 USD/kWh
Placement GPU in closed boxes:
individuals - 0.036 USD/kWh
organisation - 0.044 USD/kWh

Placement GPU on the frame:
individuals - 0.043 USD/kWh
organisation - 0.047 USD/kWh
UP Time 99.9%
from 0.053 USD/kWh
Placement GPU in closed boxes:
individuals - 0.053 USD/kWh
organisationдля юр лиц - 0.058 USD/kWh

Placement GPU on the frame:
individuals - 0.055 USD/kWh
organisation - 0.06 USD/kWh
PRICES OF CONTAINERS HOSTING
UP Time 65%
0.029 USD/kWh
UP Time 95%
0.034 USD/kWh
Too hot? Too noisy? No room?
Host your GPU, rigs and ASICs in the mining hotel goose2mining
Our services for the placement and maintenance of GPU mining farm

1. Installation and configuration of software
  • Installing and configuring HiveOS (initial start-up, OS installation, BIOS setup)
  • Installing and configuring specialized software for mining on HiveOS (connecting to a mining pool, setting payment parameters on the pool, monitoring statistics)
  • Diagnose and troubleshoot software
  • GPU overclocking
2. Diagnostics and maintenance of GPU mining farm
  • Diagnostics of the GPU mining farm (motherboard, power supply, riser / adapters, processor / RAM)
  • Maintenance of GPU mining farm (cleaning GPU mining farm / coolers, replacing thermal paste)
Our advantages in GPU farm placement
You can trust the maintenance of your GPU farms to our specialists!
Experience and competence
Sysadmins with HiveOS experience
Turnkey services
We undertake all the work of managing and maintaining GPU farms.You
control your pool and, accordingly, payments and profitability
Equipment
Use of modern network and telecommunication equipment
Infrastructure
Ensuring effective ventilation and filtration through the use of data center infrastructure
About Us
For more than 3 years we have been providing professional services for the operation of the infrastructure of blockchain projects and the placement of specialized equipment for mining.

Maining Hotel Description

1
Operator
LLC "ComSoft"
2
Capacities

Connected (0.4 kV): 5 MW
Power reserve: 20 MW
Free capacities for connecting ASICs: 1.5 MW
Free 1000 places
3
Location
Goose-Khrustalny Sity (Vladimir region), 200 km from Moscow, 50 km from Vladimir Sity
4
Site
500 m2 of equipped space in the data center building.
More than 5 000 m2 equipped site for placing containers.
5
Infrastructure
Ventilation (hot and cold aisles), filtration, 0.4 kV power supply, 100 Mbps dedicated Internet, connected racks and equipment racks
6
Power supply
Under an agreement with ESV LLC "Energosbyt Volga".
Average rate - 0.035 USD/kWh (with VAT)

Our services included in the tariff
Services
Basic plan
Optimal plan (+5%)
Maximum plan (+10%)
Delivery of client equipment to the mining hotel site
Equipment performance check
Cleaning equipment and coolers
Minor repairs
Temperature control
24/7 technical support
System administrator services
Equipment setup
Power supply
Internet 100 Mbps and dedicated IP address
24-hour security
Gallery
Power supply
Data center building
Placement on racks
Placement of containers
Electrical equipment
Hot corridor
Cold corridor
Safety filters
Ventilation

Why choose Us?

White electricity
The data center where the mining hotel is located is connected directly to the FGC power grid. 110 kV substation 800 m from the data center. The power cable is laid to the border of the site. The electricity tariff in the Vladimir region is one of the lowest in the Central Federal District of Russia.
Reliable security
The data center is guarded by a private security company.
Professional stuff
For more than 3 years we have been working in this field, and during this time we have selected a team of experienced and professional specialists: engineers, electricians, ventilation and cooling specialists, system administrators.
We work under a service agreement (collocation)
The guarantee of the safety of the equipment is determined by the Agreement.
An obligatory annex to the agreement is the SLA, which defines the list and quality of our services.
Low tariff
We guarantee the best combination of price and quality of mining hotel services.
Ventilation, cooling and filtration
During our work, we were able to create a reliable and efficient ventilation and cooling system that allows you to constantly maintain the temperature on the devices in the range from 20 to 24 degrees. even during peak periods of temperatures in the summer months.

Order hosting (equipment accomodation)
Leave your contact details and we will send you a form of a commercial offer and a draft contract
Subject
Watch Us on YouTube
Our contacts
LLC "ComSoft"
INN 3304026052 KPP 330401001
OGRN 1183328009765
601506, Vladimir region,
Goose-Khrustalny, Podolskaya st., 4, office. 1
technical support: +7 (903) 282-64-87
sales: +7 (903) 282-64-87
mail: goose2mining@mail.ru
goose2mining
Mining hotel hosting
Menu
  • Home
  • Aboute
  • Services
  • Contacts
Contact with Us
  • sales: +7(903) 282-64-87
  • support: +7 (903) 282-64-87
  • mail: goose2mining@mail.ru
Subscribe
© 2020 LLC "COMSOFT"
Made on
Tilda